Quite normal, because the slides and construction kits are transported via different conveyor belts and have different transit times. Although they are handed over to the shipping company at the same time, they do not always arrive at the same time.
Quite normal, because the slides and construction kits are transported via different conveyor belts and have different transit times. Although they are handed over to the shipping company at the same time, they do not always arrive at the same time.